Chandrayaan-1 was India's first spacecraft launched to explore the Moon. It lifted off on 22 October 2008. It was under the control of the Indian Space Research Organisation (ISRO). It was launched by a PSLV rocket. Chandrayaan 1 carried NASA's M1 Moon Mineralogy Mapper. The space mission was designed to last for two years. In reality the mission lasted for 312 days. It mapped about 95% of the moon's surface.On 29 August 2009 radio signals from Chandrayaan-I were lost. The mission was considered ended at that point. The lunar probe showed the presence of water on moon.
Follow us on:
India's first mission to Moon was launched successfully on October 22, 2008 from SDSC SHAR, Sriharikota. The spacecraft was orbiting around the Moon at a height of 100 km from the lunar surface for chemical, mineralogical and photo-geologic mapping of the Moon. The spacecraft carried 11 scientific instruments built in India, USA, UK, Germany, Sweden and Bulgaria. After the successful completion of all the major mission objectives, the orbit has been raised to 200 km during May 2009 . The satellite made more than 3400 orbits around the moon and the mission was concluded when the communication with the spacecraft was lost on August 29, 2009.
India's first mission to Moon, was launched successfully on October 22, 2008 from SDSC SHAR, Sriharikota. The spacecraft was orbiting around the Moon at a height of 100 km from the lunar surface for chemical, mineralogical and photo-geologic mapping of the Moon. The spacecraft carried 11 scientific instruments built in India, USA, UK, Germany, Sweden and Bulgaria. After the successful completion of all the major mission objectives, the orbit has been raised to 200 km during May 2009. The satellite made more than 3400 orbits around the moon and the mission was concluded when the communication with the spacecraft was lost on August 29, 2009.